Header Graphic
Merrimack River Fishing Reports, Plum Island area,, Newburyport MA. > Merrimack River dredging project


2 Oct 2010

 The river dredging project seems to be moving slower than anticipated. The storms pushing big swells onto the shallow water of the mouth required the dredging company to pull the 392' dredge Illinois back to safety.Hurricane Igor passed, the dredge was towed back out and the Salisbury portion of the project was completed last Wednesday, the 29th of September. Most of the pipe seems to be in place for the Newbury/ Newburyport phase of the project and the tugs pulled the dredge back out on Sunday (Oct. 3rd). With a 3 day Nor'Easter forecast we will have to see how that works out!

Dredge working south side of river between cans #3 & #5

Crane removing pipe off Salisbury Beach to be moved to Newburyport side for second, larger, portion of beach replenishment project.

Fishing Newburyport

Contact Captain Scott Maguire via:

E-mail: captscottmaguire@comcast.net

 Telephone: 978-465-2307

Book a Charter TODAY!

Fishing Newburyport

[Fishing Charters] [Fishing Organizations] [About Your Private Charter] [Rates] [This is Your Charter!]  [Photo Album 2009]  [North Shore Fishing Photos]  [Merrimack Fishing Reports]   [Striped Bass Photos] [More Bass & Bluefish Pictures] [2007 Fish Photos]  [Book a Charter] [Directions to Newburyport MA] [Testimonials] [Charts] [Weather
 

Visit us on FaceBook

View site in Mobile

Web Design by KaSondera at www.completewebpagedesign.com
 
©2004 -2024 Summer Job Fishing Charters. All rights reserved.